3. Clarify details and trade responsibilities
Include wall sections and details for openings, lintels, sills, caps, flashing, weeps, ties, anchors and control or movement joints where applicable. Identify who supplies and installs related items such as frames, supports and insulation.
For existing walls or infill work, include current photos and available as-built information. List any demolition, temporary support or other related work separately so responsibility can be confirmed. Requirements should come from the project documents and responsible design team, not be inferred from a generic checklist.